The challenge

Development of 5 km of service roads and a 20,000 m² paved parking area for trucks in the downstream zone. The project uses Neoloy® Geocell technology to stabilize mangrove soils, cutting material needs and generating around 30% cost savings.

How we responded

Deployment

In the downstream zone of the Port of Douala, RoadVision completed the development of 5 km of service roads and a 20,000 m² truck parking area. The project relied on Neoloy® Geocell technology to reinforce highly compressible mangrove soils, reducing the volume of imported fill required. This approach ensured a stable platform for heavy truck operations while delivering close to 30% cost savings.

Results

  • Reduced replacement materials
  • Cost savings ~30%
  • Stable and durable heavy truck parking
  • Adapted to sensitive mangrove environment

Testimonials

“The Port Authority of Douala entrusted us with building parking areas and roadways in a mangrove zone. By using Geocell technology, we were able to stabilize the soil, cut down on replacement materials, and achieve nearly 30% savings on the overall pavement cost.”

Emeric Laure Djeumen Tchoumkeu, Technical Director